Purpose:

 

On the 30th of June 2015 a leap second will be added, this could have an effect on some Operating Systems and result in high CPU usage.  Leap second already happened in 2012 and 2008, but no issues were observed.

 

For general information from SAP point of view please consult information in notes below:

 

  • 1738172 - Linux: High Machine Load due to Leap Second
  • 1735719 - Leap seconds and the SAP system

 

Additional information:

From  Windows point of view you can find more information in Microsoft knowledgebase :
https://support.microsoft.com/en-us/kb/909614

 

From  Red Hat Enterprise Linux point of view you can find more information in Redhat knowledgebase :
https://access.redhat.com/articles/15145

 

Do you have further questions?

Before creating an SAP incident, you can post a discussion thread in the Software Logistics discussion space.  Community members will provide you with the answers you need.


DMO: introducing the benchmarking tool

$
0
0

This blog introduces the benchmarking tool for checking the migration rate prior to database migration option (DMO). As a prerequisite, you should read the introductionary document about DMO: Database Migration Option (DMO) of SUM - Introduction

 

Tuning the DMO procedure to shorten the downtime is an important task. With Software Update Manager (SUM) 1.0 SP13, we have an additional, important feature, to be added as the very first technique in the list of means to reduce the technical downtime:

How to tune DMO downtime

  1. Before the DMO run: use the benchmarking tool to evaluate the migration rate for an existing system
  2. Before the DMO run: consider to run SUM/DMO on an Additional Application Server (AAS, fka DI) instead of PAS
  3. During the DMO test run: adapt the number of R3load processes to balance the performance of the SAP application server
  4. After a (successful) test run: provide the "table duration files" for the next DMO run to optimize the table split mechanism
  5. If downtime expectations are not met, consider using "downtime optimized DMO", see
    DMO: downtime optimization by migrating app tables during uptime (preview)

 

Scope of benchmarking tool

 

  • The benchmarking tool offers a fast check for possible migration speed prior to the DMO run
  • The source system may continue to run (uptime)
  • You can select specific tables, or use a specific percentage of all tables for the benchmarking run
  • You can benchmark the export from the source system only, or benchmark the export and the import to the SAP HANA DB

 

What is the benchmarking tool

 

  • The benchmarking tool is - trara: the SAPup (as part of the Software Update Manager, SUM)
  • SAPup is triggering R3load for the export and import, like during the DMO run
  • Prerequisite is the download folder, containing the source and target kernel files, like for DMO
  • SAPup will not create a shadow repository, and skip other phases as well,
    that is why the benchmarking run is so fast (and cannot be used for a real migration/system copy)

 

How to start the benchmarking tool

  • Prerequisite is that no DMO run is active, that means:
    if you have started a DMO before, you will have to reset the DMO run, cleanup, and stop all SAPup processes
  • You start the benchmarking tool as the "migtool" option of SUM/DMO with a slightly different URL:
    https://<host>:1129/lmsl/migtool/<SID>/doc/sluigui
  • The SL UI will show dialogs to select the benchmarking options, and the number of R3load processes to be used
  • After the benchmarking run, a dialog will prompt you to analyze the log file to check the migration rate
  • It is not possible to use the benchmarking tool while using the "old DMO UI" (with URL suffix /doc/gui)

 

Things to keep in mind

  • Tuning: you should adapt the number of R3load processes for optimized usage of the application server performance (like in DMO), and then analyze the log file to check the migration rate
  • Naming: the R3loads for "UT" are used for the preparation (table split), the R3loads for "DT" are used for the export (&import, if selected), so UT and DT are no indication for uptime or downtime (concerning the configuration of R3load processes)
  • Uptime or downtime benchmarking: you may consider to shut down the SAP system to tune the optimum number of R3loads for the DMO downtime run
  • Documentation: the benchmarking tool is described in the DMO guide, section "Migration Tools"
  • Migtools: "Migration Tools" are a) the benchmarking tool, and b) the standalone table comparison option of SUM. The latter is used for classical migration, and described in the guide of the Software Provisioning Manager (SWPM)
  • Benchmarking theexport: if you select the option to only export selected data from the source database, SAPup will trigger the R3load with the option "discard", which will not create any files. This allows you to analyze the speed of the export from the source database without creating files, as the DMO run will not create export files either
  • Using the benchmarking tool to do a system copy is not supported by SAP

 

Boris Rubarth

Product Manager, Software Logistics, SAP SE

DMO news with SUM 1.0 SP13

$
0
0

This blog introduces the news for database migration option (DMO) with Software Update Manager (SUM) 1.0 SP13. As a prerequisite, you should read the introductionary document about DMO: Database Migration Option (DMO) of SUM - Introduction

1. Benchmarking tool for testing migration performance

The benchmarking tool is a new SUM option that offers a kind of test migration, while the system may even be in uptime. This way, you may get a first impression on the possible migration rate, and identify bottlenecks. The benchmarking option is explained in the DMO guide, section 7.3, and in the following blog:  DMO: introducing the benchmarking tool

2. Start release R/3 4.6C

SAP R/3 4.6C is now supported as a start release for DMO (but not R/3 4.7).

Note that the DMO guide contains an important note on manual partitioning of tables for this start release.

3. ROWID-based export for Oracle source database

For Oracle source database only, the DMO procedure will do the export based on the ROWID which shall accelerate the export. ROWID-based export does currently not work for cluster tables.

No configuration required, works out of the box.

 

4. Pipe mode for Windows OS

Until now, the pipe mode for the communication of the R3load pair on the server was restricted to non-Windows platforms; now pipe-mode is used on Windows OS as well. See SCN blog for details on pipe mode: DMO: comparing pipe and file mode for R3load.

No configuration required, works out of the box.

 

5. Run of DMO/SUM on AAS

Finally, the execution of SUM (for DMO and non-DMO scenarios) on an Additional Application Server (AAS, fka DI) was part of the validation and can be recommended officially, although we knew it works. For DMO this offers the option to run DMO on an AAS with higher performance, instead of running it on the Primary Application Server (PAS, fka CI).

No specific considerations required, you just extract the SUM archive on the AAS.

 

6. New SL UI

After DMO was the first SUM scenario using a SAPUI5 based user interface, the SL UI (Software Logistics User Interface) was implemented, which will be the common UI for all SUM scenarios, as well as for other SL tools in the future. It uses a slightly different URL with suffix /doc/sluigui (sounds like "Huey Lewis" to me ).

Note that the usage of the SL UI is possible for maintenance scenarios with SUM SP13 now as well (AS ABAP or AS JAVA - not dual stack), but the default UI is still the SDT gui / java based UI.

7. Table duration files location

An important tuning mechanism of DMO is the (hopefully well-known) usage of table duration files. SAPup creates these files after a DMO run, they include the table migration duration, and they can be feed back to the next DMO run to improve the table split. With SUM SP13, these are XML documents (instead of LST files). You can simply put the files into the download folder, and SAPup will consider the files. So no need to configure the SAPup_add.par file with the location of the duration files any more.

DMO: table comparison and migration tools

$
0
0

This blog discusses the table comparison and the migration tools of Software Update Manager (SUM) and database migration option (DMO). As a prerequisite, you should read the introduction document about DMO: Database Migration Option (DMO) of SUM - Introduction

 

Explanation of terms

 

SUM and DMO

Software Update Manager (SUM) has several use cases, one of these is database migration option (DMO). DMO combines the update/upgrade of the SAP software with the database migration to SAP HANA database.

 

Note: DMO is not a tool, it is one of several use cases for SUM.

 

DMO compares number of table rows

DMO will in any case compare the number of rows for each table before and after the migration - we call this count*.

 

DMO may compare content of table rows

As part of the DMO migration, you can optionally switch on the table comparison of DMO. This will - in addition to count* - compare the content of table rows before and after the migration. Comparing the table content will extend the downtime, so it is not recommended to enable table comparison for a DMO run on a productive system.

Note: You may consider enable the table comparison in a productive run as well i.e. for certain tables only, if it is required to prove that the content is identical.

 

SUM may compare content of table rows for classical migration

The SUM offers the new use case "table comparison standalone" that can be used as an optional step for a classical migration.

The classical migration is the heterogeneous system copy offered by the Software Provisioning Manager (SWPM). So for the classical migration as such, the SUM is not used, as for a migration to SAP HANA, you can decide to either go for the classical migration using the SWPM, or go for the DMO using the SUM.

For more information on this topic, see Migration of SAP Systems to SAP HANA.

 

In former times, you could only use the table checker tool to ensure that all tables were completely copied as part of a classical migration (for more information, see SAP Note 2009651). Now, you also have the option to use the table comparision for the classical migration as well, for which you may use the SUM in a specific mode (called migtool, explained below). This is called table comparison standalone  - standalone as it is not part of the DMO run.

 

 

Introducing the migtools of SUM

 

The Migration Tools (migtools) in this context are simply two SUM use cases that are bundled separately, and which are neither part of a standard SUM maintenance nor of a standard DMO migration.

 

Migtools of SUM are:

 

Both options will not be used as part of a DMO run itself; but the benchmarking should be used before starting the DMO run.


Note: the migtools are not really tools, but use cases for SUM.

Note: For classical migrations using the Software Provisioning Manager, there are also migration tools (such as Migration Monitor, splitter tools – and Table Checker, as mentioned above),  which you must not confuse with the migtools of SUM with. For more information about the migration tools of the classical migration, see SAP Note 784118.

 

 

"Compare" <table comparison with DMO> versus <table comparison standalone>

 

Now let us compare the two compare options - still with me?

 

Aspecttable comparison of DMOtable comparison standalone
Use case

 

Table comparison during migration run using DMO of SUM; the dialog "Database Migration Option" offers to enable and configure the table comparison

 

Table comparison during classical migration run using SWPM: SUM has to be started separately as migtool

Focus

 

Same for both:

Tables for which the content shall be compared: either you list specific tables, or a percentage of all tables

Integration


Yes: option is part of DMO


No: not part of DMO; manually execution required for use in classical migration

Drill down
possible


Yes: if difference appears, drill down is done to identify the row with different content


No: only tables are listed that show a difference

Documentation

 

Part of DMO guide (section 7.2)

 

Part of System copy guide (section Table Comparison with Software Update Manager)

 

     Note: both use cases to not export the table content to disk. A checksum is created for each table, these checksums are persisted.

 

Note: there may be scenarios for which only the "old" table checker tool (described in SAP note 2009651)  can be used, e.g. access to source database is no longer possible to generate CRC files with SUM table, but the export files with TOC are still available.

Configuration of export CTS system in HALM and tracing possible issues.

$
0
0

Very often I can see that users have issues by configuring of export CTS system in HALM. There is actually a very good guide about how to configure HANA for CTS. Nevertheless, it is still one of the most reported issues. I prepared a short video which could help you to configure an export CTS system and possibly to trace the problems (if any). Please, take a look.

 

 

Pease be sure that the requirements listed in the note 2097341 are fulfilled, especially regarding roles.

Please also note, that the alias for the Export Web Service point should be specified starting with a slash (i.e. /001/export_cts_ws).

 

 

In the case of issues by registering of a CTS system, you could try a very simple tool helping you to diagnose the outgoing HTTP Destination. The tool itself is attached to the mentioned note. The instructions how to use the tool are also attached.

 

 

References

[1] Change and Transport System

[2] How To Configure SAP HANA for CTS in SAP HANA S... | SCN

ADFS 2.0 Configuration for SAP HANA Cloud Platform

$
0
0

This post contains step-by-step guide, how-to configure Active Directory Federation Services (AD FS) 2.0 with SAP HANA Cloud Platform (HCP).

Overview

The following steps are required to enable AD FS as SAML Identity Provider for an HCP account:

  1. In HCP: Establish trust to AD FS, configure AD FS as Trusted Identity Provider for your HCP account
  2. In AD FS: Establish trust to HCP, configure HCP as Relying Party in your AD FS

Note: When adding the metadata of Identity/Service Provider, you need to select SHA-1 as Signature Algorithm (Secure hash algorithm).

 

In HCP: Establish Trust to AD FS

Step 1: Export SAML Identity Provider (AD FS) Federation Metadata

 

We need to get the ADFS 2.0 federation metadata which is accessible on the following URL:

https://<ADFS2.0 Server Host>/FederationMetadata/2007-06/FederationMetadata.xml

 

(In some cases, you need to be on the ADFS 2.0 Server Host, to access the federation metadata).

This page will list the content of the xml file.
Download the file (ctrl + S or File -> Save) as xml.

 

 

Step 2: Import the AD FS Federation Metadata into your HCP account

 

Open it from https://account.hana.ondemand.com/, then

  1. From the left list menu, navigate to Trust
  2. In the center of the page, navigate to Trusted Identity Provider
  3. Then click on Add Trusted Identity Provider:

 

1-hcp-add-idp.png

   4. Here we upload Federation Metadata by clicking Browse, and navigate to the FederationMetadata.xml file on our host (as downloaded in Step 1).
  Once we select the file, it will automatically fill in all required fields.

 

 

Step 3: Create a Default Group Assignment

 

   5. Then go to Groups tab on the top, where we add default group, which will be assigned for each and every user (we use this, to make sure, ADFS users can access the applications).

2-hcp-upload-metadata-select-groups.png

As the predefined HCP group “Everyone” holds the basic permissions to be assigned for the applications we would like to access, we assign it as default group to the users authenticated via AD FS:

   6. Click Add Default Group to add a default group.

   7. From the dropdown, select the default group “Everyone

   8. Press Save in the bottom right corner, to finally save the Trusted Identity Provider.

 

3-hcp-add-everyone-group-save.png

In AD FS: Establish Trust to HCP

 

Step 1: Export Service Provider (HCP account) Metadata

 

  1. Go to your HCP Account, navigate to Trust
  2. Select Local Service Provider in the center of the page. Usually it is selected by default.
  3. Click Get Metadata and download the xml file. Some browsers might download the file automatically when you click on the link.

4-hcp-get-metadata.png

Step 2: Import Service Provider (HCP account) Metadata (HCP) into your AD FS

 

  1. Open AD FS 2.0 Management and in the left menu navigate to AD FS 2.0
  2. Then TrustRelationships
  3. Then Relying Party Trusts
  4. On the right actions column menu, press Add Relying Party Trust…

 

5-adfs-add-repying-party-trust.png

 

The “Add Relying Party Trust” Wizard will guide through the process:

Begin with the Start button and on the second screen (Select Data Source),

  1. Select Import data about the relying party from a file,
  2. Then press Browse to select the HCP Metadata file (as downloaded in Step 1),
  3. Then Next.

6-adfs-add-metadata.png

 

   4. On the next dialog “Specify Display Name”, select the name of the Relying Party Trust, it will be just a list name, then Next.

   5. On the Choose Issuance Authorization Rules, we select Permit all users to access this relying party and then Next -> Next -> Close.

 

 

Step 3: Create Claim Rule to define the mapping of user ID from AD to HCP

 

When closing the “Add Relying Party Trust” wizard, the “Edit claim rules” wizard will be opened.

If not, you can right click on Relying Party Trust -> Edit claim rules to start it.

 

  1. In the “Edit Claim Rules” window, we go to “Issuance Transform Rules” tab on top
  2. Then Add Rule… .

7-add-rule.png

To define the rule type in the “Add Transform Claim Rule” Wizard, from the dropdown Claim rule template, select Send LDAP Attributes as Claims, then Next.

Then, to specify the rule:

  1. Add the Claim rule name (e.g. “SAN to NameID”),
  2. for Attribute store select Active Directory from the dropdown,
  3. then map LDAP Attribute SAMAccount-Name
  4. to Outgoing Claim Type Name ID,
  5. and press Finish.

8-claim-rule-definition.png

 

Step 4: Change Secure hash algorithm

To change Secure hash algorithm, you have to right click on Relying Party Trust -> Properties and then:

  1. Navigate to Advanced tab
  2. Then change the Secure hash algorithm to SHA-1
  3. Then OK

9-change-secure-hash-algorithm.png

 

Now you should be able to login, using your AD FS users.

SL Toolset 1.0 SPS 14: improved Software Logistics Tools

$
0
0

This blog describes the new and improved tools in the SL Toolset 1.0 with SPS 14.
    You should be familiar with the concept of the Software Logistics Toolset 1.0 ("SL Toolset"), see
      The Delivery Channel for Software Logistics Tools: "Software Logistics Toolset 1.0"

 

 

Overview on tools delivered with SL Toolset 1.0 SPS 14

 

Availability: SL Toolset 1.0 SPS 14 is available since September 15th 2015.

 

What's in:

  • compared with SPS 13, no new tool joined the SL Toolset 1.0
  • existing tools are improved and updated: some tools are delivered in a new SP, some without (when only minor fixes where done)
  • Most of the tools offer a feedback form to provide both statistical data as well as individual feedback

sl_toolset_sps14_tool_overview.jpg

Further information on the SL Toolset SPS 14:

  • SAP Note 2079036 (Release Note for SL Toolset 1.0 SPS 14; logon required)
  • Quick link /sltoolset on SAP Service Marketplace (logon required)
  • Idea Space for the Software Logistics Toolset and its tools

 

 

"nZDM for SAP NetWeaver Java" 1.0 SP 14

 

Offering

  • implement Support Packages and patches for SAP Java-stack systems with minimal technical downtime
  • Target Products:
    • SAP Enterprise Portal 7.02, 7.3x, 7.4
    • SAP Business Process Management and SAP Process Orchestration
      releases 7.3 incl. EHPs, and 7.4 (see SAP Note 2039886; logon required)

Changes with SL Toolset SPS 14

  • nZDM for SAP PO and SAP BPM are general available
  • Added support for SAP HANA as nZDM supported database
  • nZDM command line interface is now offered

More information

 

"nZDM for SAP Process Integration" 1.0 SP 08

 

Offering

  • implement Support Packages for SAP Process Integration (SAP PI) with minimal technical downtime of appr. 30-60 minutes
  • Target Products: SAP PI dual stack 7.10, 7.11, 7.30, 7.31

 

Changes with SL Toolset SPS 14

  • No changes

 

More information

 

 

Software Provisioning Manager 1.0 SP 09

 

Offering

With software provisioning manager, get latest SAPinst version that enables provisioning processes for several products and releases for all supported platforms – get support of latest products, versions and platforms, including latest fixes in tool and supported processes + benefit from unified process for different product versions.

 

Changes with SL Toolset SPS 14

  • Further improvements concerning up-to-date installation, where Software Provisioning Manager now comprises:
    • Option to install further languages as part of the installation
    • Option to apply SAP Notes required by Software Update Manager
  • Option to extract kernel from existing system and use this kernel for installation and system copy
  • SAP Web Dispatcher installation adapted (prompted/set configuration parameters + profile)
  • Option for parallel execution of size determination (R3szchk) of source data during export
    • Now also supported for systems based on SAP NetWeaver 7.0x
  • Option to decluster and depool tables now supported for installation and R3load-based system copy on all database platforms (including SAP MaxDB)
  • Dual-stack split procedure adapted: new option to persist Message Server port configuration from original SCS instance, dual-stack split procedure now also supported for SAP ASE

 

More information

 

 

Software Update Manager 1.0 SP 14

 

Offering

  • Consolidation of different software logistics tools into one unified software logistics tool
  • Runtime reduction: Higher degree of parallelization for certain phase types
  • Downtime reduction: Enhanced Shadow System capabilities for specific use cases
  • Combine SAP system update with migration to SAP HANA (DMO: database migration option)

 

Changes with SL Toolset SPS 14

  • AS ABAP, AS Java: mandatory usage of new SL UI user interface (SAPUI5 based)
  • AS ABAP: buffer import of customer transport requests
  • DMO: support for SAP ASE & MS SQL as target database (available on request)
  • DMO: support for Multi Database Containers (MDC) on SAP HANA DB
  • DMO: support for non-Unicode SAP SCM systems
  • DMO: improved monitoring for R3load usage, and test cycle option for quick migration repeat

 

More information

 

 

Standalone Task Manager for Lifecycle Management Automation 1.0 SP 01


Offering

Stand-alone task manager for lifecycle management automation is a framework to execute below automated configuration templates

  • SSL configuration templates validates the SSL configuration settings both, for ABAP and for Java environments and generates HTML reports that can be used for further analysis. It also performs SSL configuration automatically and describes required manual tasks.(SAP Note 1891360)
  • SAP ERP <-> SAP CRM, template to establish connectivity between SAP ERP system and SAP CRM
  • Mobile Configuration templates for Backend, Gateway and SUP (SAP Note 1891358)
  • HANA user management and SLT (System Landscape Transformation) configuration (SAP Note 1891393)

 

Changes with SL Toolset SPS 14

  • No changes


More information

 

 

SAPSetup 9.0


Offering

SAPSetup offers easy and reliable functionality for installations of different scales:

  • Installation of frontend products without administrator permissions
  • Remote installations from Administration PC
  • Configuration and export of installation packages containing multiple products
  • Consistency check
  • Central log file analysis

 

Changes with SL Toolset SPS 14

  • SAPSetup with the latest corrections as outlined in the SAP Notes below, for example, remote installation re-designed

 

Further information:

 

 

CTS Plug-In 2.0 SP 15


Offering

  • Generic CTS to connect your non-ABAP applications with CTS
  • New user interfaces and new features for CTS
  • Central Change and Transport System (cCTS) as technical infrastructure for Change Request Management (ChaRM) and Quality Gate Management (QGM) in SAP Solution Manager 7.1 SPS 10 and higher

Changes with SL Toolset SPS 14

  • Improvements for CTS Plug-In are no longer delivered with SL Toolset, but will come with the respective SAP NetWeaver support packages, for more information see SAP Note 1665940

More information

 

AddOn Installation Tool and Support Package Manager

 

Offering

SPAM/SAINT provides easy access to lifecycle management processes by being part of the SAP NetWeaver AS ABAP stack and by being accessible directly via SAP GUI.  This way you are able to control different kinds of implementation processes, such as installing, upgrading or updating ABAP software components. SPAM/SAINT Updates themselves can be applied to ABAP-based systems independent of underlying SAP NetWeaver component versions.

 

Changes with SL Toolset SPS 14

  • No changes

 

More information

 

 

Scenario "Up-to-date Installation"

Up-To-Date Installation refers to an enhanced process for the installation of new system at any chosen stack level. The new improved process enables complete planning in Maintenance Planner, which generates a consolidated stack XML and archives, which are later consumed by Software Provisioning Manager and SUM.

See the following blog for more details: Up-To-Date Installation

Know more about Maintenance Planner: Maintenance Planner – The Next Generation Experience for Landscape Maintenance with SAP Solution Manager

 

 

 

Boris Rubarth

Product Management SAP SE, Software Logistics

TMSADM problems

$
0
0

When having setting STMS or running report TMS_UPDATE_PWD_OF_TMSADM you can have problems with user TMSADM in client 000 of the domain controller. Before changing TMSADM password, it is recommended to check document Changing the TMSADM password to make sure all the required notes are applied.

 

SAP Note 1568362 has attached a report to check the TMSADM user. This report identifies any issues with TMSADM before executing report TMS_UPDATE_PWD_OF_TMSADM or configuring STMS.

 

This is an example of the output of the report:

tmsadm.PNG

If one of the checks return a red light, you will have problems during the execution of the TMSADM report or the STMS configuration.

 

Please leave us your feedback and also let us know if you run into any issue when using the tool.


SL Toolset 1.0 SPS 15: improved Software Logistics Tools

$
0
0

This blog describes the new and improved tools in the SL Toolset 1.0 with SPS 15.
    You should be familiar with the concept of the Software Logistics Toolset 1.0 ("SL Toolset"), see
      The Delivery Channel for Software Logistics Tools: "Software Logistics Toolset 1.0"

 

 

Overview on tools delivered with SL Toolset 1.0 SPS 15

 

Availability: SL Toolset 1.0 SPS 15 is available since October 20th 2015.

 

What's in:

  • compared with SPS 14, no new tool joined the SL Toolset 1.0
  • compared with SPS 14, only SUM 1.0 was delivered with a new SP-level


sl_toolset_sps15_tool_overview.jpg

Further information on the SL Toolset SPS 15:

  • SAP Note 2156059 (Release Note for SL Toolset 1.0 SPS 15; logon required)
  • Quick link /sltoolset on SAP Service Marketplace (logon required)
  • Idea Space for the Software Logistics Toolset and its tools

 

 

 

Software Update Manager 1.0 SP 15

 

Offering

  • Consolidation of different software logistics tools into one unified software logistics tool
  • Runtime reduction: Higher degree of parallelization for certain phase types
  • Downtime reduction: Enhanced Shadow System capabilities for specific use cases
  • Combine SAP system update with migration to SAP HANA (DMO: database migration option)

 

Changes with SL Toolset SPS 15

  • Support for scenarios with target system based on SAP NetWeaver 7.5

Note

  • For all other scenarios, SUM 1.0 SP 14 has to be used
  • SUM 1.0 SP 16 will support all scenarios, and will be unique (expected in Q1 2016)

More information

 

 

For all other tools, check the details on the SL Toolset SPS 14 blog:

SL Toolset 1.0 SPS 14: improved Software Logistics Tools

 

 

Boris Rubarth

Product Management SAP SE, Software Logistics

SUM 1.0 SP 14 gets a buddy called SP 15

$
0
0

SUM 1.0 SP 14 and SP 15

 

Recently, we announced the availability of SL Toolset 1.0 SPS 14, which contains Software Update Manager (SUM) 1.0 SP 14 (see SL Toolset 1.0 SPS 14: improved Software Logistics Tools). Now we offer a supplement: for an intermediate period, SUM 1.0 SP 15 accompanies SUM 1.0 SP 14, and both have their own use cases:

  • SUM 1.0 SP 14 for all use cases available until now
  • SUM 1.0 SP 15 for all use cases targeting a system based on SAP NetWeaver 7.5

As the buddies know each other, you will get notified if you start the wrong tool for your scenario. Support and fixes will be provided for both versions.

 

SUM SP 15 is required e.g. for

  • Update or Upgrade to systems based on SAP NetWeaver 7.5 (e.g. from SAP ECC 6.0)
  • System Conversion to SAP S/4HANA on premise (*)

(*) according to current planning, disclaimer applies

 

SUM 1.0 SP 16 will combine all use cases back in one tool, next year.

SUM_SP14_15_16.png

 

SL Toolset 1.0 SPS 15: successor for SPS 14

 

As you know, the SUM is part of the Software Logistics Toolset (SL Toolset) which we deliver approximately three times a year with a new SP-stack. It typically offers updated tools, which is reflected in a new SP-level for the tool, and a new SPS-level for the SL Toolset 1.0.

But we will not offer two versions of the SL Toolset in parallel: SL Toolset 1.0 SPS 15 follows on SPS 14. The SL Toolset is a delivery channel (rather a bundle than a real archive), and SL Toolset 1.0 SPS 15 now offers SUM 1.0 SP 15 (see SL Toolset 1.0 SPS 15: improved Software Logistics Tools).

Therefore, with SL Toolset 1.0 SPS 15, we have a new situation: SL Toolset will only offer an update only for the SUM, and the other tools remain on their SP-level. This is an intermediate situation until we offer SL Toolset 1.0 SPS 16 in Q1 2016 (current planning), with all tools on new SP-levels.

 

 

 

Boris Rubarth,
Product Manager Software Logistics, SAP SE

System Conversion to SAP S/4HANA: SUM is the tool

$
0
0

This blog discusses the technical aspects of a System Conversion:
the transition of an existing SAP Business Suite system to SAP S/4HANA on premise.
The content will be extended step by step.


S/4HANA is a new product line

  • SAP S/4HANA is not a successor of SAP Business Suite, it is a new product line
  • This is why we do not talk about migration to S/4HANA (for a source like SAP ECC 6.0)
  • The terminology is Transition, and there are three options
    • New installation
    • System Conversion
    • Landscape Transformation
  • SAP S/4HANA is available as on-premise or cloud edition
  • The SCN blog from Frank Wagner is an excellent starting point:
    The road to SAP S/4HANA: the different transition paths

 

S4HANA_family_and_paths.png

 

System Conversion: SUM is the tool for the transition to SAP S/4HANA on premise

  • System Conversion is the process of transitioning an existing SAP ECC system to SAP S/4HANA on Premise
  • Software Update Manager (SUM) is the tool for this transition: either with or without DMO
    • If the source is already on SAP HANA DB, it is SUM w/o DMO
    • If the source is not yet on SAP HANA DB, it is SUM w/  DMO
  • This blog only covers the System Conversion to SAP S/4HANA on premise only


SUM 1.0 SP15 for system conversion

  • SUM SP15 is required for all scenarios targeting SAP NetWeaver 7.5 based systems
  • SUM SP15 is available since October 2015
  • SUM SP14 is available since September 2015
  • Both SUM SP14 and SP15 are offered in parallel until SUM SP16 is available (expected in Q1 2016)
  • SUM SP16 will then again be the unique tool for all scenarios, including 7.5 based systems


SUM_is_the_tool.png


One-step or two: depends on Unicode (UC)

  • General rule:
    • If the source system is already on UC, the transition is a one-step procedure
    • If the source system is not yet on UC, the transition is a two-step procedure
  • Exception
    • For SAP R/3 4.7 and SAP ECC 5.0 Unicode systems: these releases do not include the Customer-Vendor-integration (with Business Partners) that is required for SAP S/4HANA, so a two-step approach is required
  • Yes, in general DMO may include the UC Conversion - but not for target NW 7.5:
    • NW 7.5 is only UC: no non-UC kernel (and no non-UC export load) available
    • DMO builds up a shadow system for the source system on the new release
    • For non-UC systems, this shadow system has to be non-UC -> not possible for NW 7.5
  • Recommended path for non-UC source systems is discussed below
  • Even if one-step is possible, for business reasons customers may decide to have several steps, as discussed by Frank Wagner (see above)


Important:
it is relevant for all target systems based on SAP NetWeaver 7.5 (also for possible upcoming SAP Business Suite 7 versions) that the source system has to be already on Unicode.


source_is_UC.png


System conversion is more than a technical SUM procedure

  • Apart from the SUM run (with or without DMO), the procedure includes
    • Maintenance planning with Maintenance Planner (instead of MOpz):

    -  includes checks for AddOns, software components, activated business functions

    -  allows the download of stack.xml and software files like MOpz

    -  Introduction to Maintenance Planner in SCN: http://scn.sap.com/docs/DOC-65243

    • Preparation checks for system, based on SAP Notes
    • Code check
    • post activities during downtime (like reports) to migrate the data from old to new data model
  • The preparation and the data migration requires involvement of colleagues from business


SAP S/4HANA Simple Finance 1503 is a special member of SAP S/4HANA family

  • SAP Simple Finance on premise edition 1503 (fka sFIN 2.0) is a part of the SAP S/4HANA family
  • Still "1503" is slightly different from a technical perspective
    • it is based on NW 7.4 (not 7.5)
    • Usage of Maintenance Planner is not mandatory (but recommended)
    • Transition to "1503" with SUM/DMO including Unicode Conversion is possible
  • Note that "sFIN" is not the official name
  • Note that SAP S/4HANA Simple Finance 1602 will be based on NW 7.5, so source has to be Unicode!


Recommended path for two-step approach: goto 6.17 oH

  • As discussed above, a two-step approach is required: for non-UC systems and for R/3 4.7 & SAP ECC 5.0
  • Recommendation:
    • first step to for SAP ECC 6.0 EHP 7 on HANA (6.17 oH) with SUM w/ DMO
    • second step later then with SUM (w/o DMO) to SAP S/4HANA 1511 ff
  • Exception: DMO not supported for SAP R/3 4.7:
    • use SUM (w/o DMO) to 6.17 on sourceDB
    • later SUM w/ DMO to SAP S/4HANA
  • Alternative for SAP ECC 6.0 EHP 0...7 on anyDB:
    • You may only do the Unicode Conversion without update & migration (stay on software level)
    • Benefit: no change of business processes, so project effort may be reduced
    • Disadvantage: you need additional hardware to support a parallel DB export/import to minimize the Unicode conversion downtime, which would not be required for SUM w/ DMO
  • Discussion:
    • Targeting 6.17 oH as first step is a handy general rule, although exeption exist
    • Targeting EHP8 not possible, because it is based on 7.50 => requires UC source system

 

source_is_nonUC.png

 

Best regards, Boris Rubarth

Product Manager Software Update Manager, SAP SE

Latest SAP Process Integration systems are no longer dual-stack

$
0
0

SAP had removed optional dual stack as useful deployment option already quite some time ago – but so far, only for optional dual-stack setups, while there were still some exceptions for mandatory dual-stack setups even in higher releases, such as with SAP NetWeaver 7.4. There, SAP Process Integration (SAP PI) still is (and will remain) a mandatory dual-stack system and the system provisioning procedures, such as installation and system copy, offer corresponding procedures also to handle those dual-stack systems.

 

With SAP NetWeaver 7.5, this now changes: as of this release, also SAP PI no longer is a dual-stack system, so no dual-stack systems are supported in this release – without exception.

 

This has implications about how you install SAP PI systems with release 7.5 or higher and about how you upgrade to such releases, as outlined below.

 

Installation of SAP PI 7.5 and higher

As a consequence, compared to previous releases, the standard installation of SAP PI 7.5 and higher does no longer install a dual-stack system, but consists of two installation procedures: one for a separate ABAP stack and one for a separate Java stack (besides the option to install the Advanced Adapter Engine Extended, which is based on AS Java only - for more information about SAP Process Integration release recommendations, see SAP Note 1515223). In detail:

  • First, you perform the installation of ‘Application Server ABAP for SAP Process Integration’, as offered by Software Provisioning Manager: there, also Java users for the Application Server Java (AS Java) for the SAP PI system are created and the ABAP system is prepared to get connected to the AS Java system.
    AS_ABAP.jpg

  • Second, you perform the installation of ‘Application Server Java for SAP Process Integration’, also as offered by Software Provisioning Manager: there, the ‘Application Server Java for SAP Process Integration’ system uses the User Management Engine (UME) of the ‘Application Server ABAP for SAP Process Integration‘ system that you must have installed before (as outlined in the previous step).
    AS_Java.jpg

 

Upgrade to SAP PI 7.5 SP1

After upgrading to SAP PI 7.5 SP1, you first have to split the still existing dual-stack system before you can use it productively – for this, the standard dual-stack split procedure that exists for quite some time now also supports SAP PI 7.5 SP1 and higher.

 

For more information about the dual-stack split procedure, see the Dual-Stack Split page in SAP Community Network and the dual-stack split guide available at http://service.sap.com/sltoolset - Software Logistics Toolset 1.0 - Documentation - Software Provisioning - Dual-Stack Split: Systems Based on SAP NW 7.1 and Higher.

 

 

Outlook at SAP Solution Manager 7.2

As you maybe know, also SAP Solution Manager 7.0 and 7.1 systems are mandatory dual-stack systems. With SAP Solution Manager 7.2, this is also planned to be changed. Also for these systems, we plan to extend the support of our reliable dual-stack split procedure. Expect to get more information as soon as the ramp-up of SAP Solution Manager 7.2 has started.

SAP TechEd 2015 Las Vegas Session Replay: SAP Notes and ABAP Add-Ons – What‘s New?

$
0
0

This session covers key enhancements related to the SAP Notes service and ABAP add-ons. Get introduced to transport-based correction instructions, which is a new approach for delivering ABAP code, bridging the gap between support packages and SAP Notes. Learn how to search notes to solve a specific issue based on issue replication with the automated note search tool. Learn how to de-install an ABAP add-on and how SAP Add-On Assembly Kit software has been enhanced to enable this for our partners.

 

Click here to watch the session replay!!

Optimizing DMO Performance

$
0
0

When migrating an existing SAP system to the SAP HANA database using SUM with database migration option (DMO), several ways exist to optimize the performance and reduce the downtime.

 

This blog covers the topics benchmarking, optimization and analysis step-by-step. Therefore you should read and follow the steps in sequence

 

The following graphic gives you an overview of the migration process and will be used below to visualize the performance optimization options.

 

 

 


 

Optimizing the standard DMO performance

 

Preparation steps

 

The DMO uses tables from the nametab. Therefore it is recommended to clean up the nametab before starting a DMO run. Proceed as follows:

 

1.) Start transaction DB02 (Tables and Indexes Monitor) and choose “Missing tables and Indexes”

 

2.) Resolve any detected inconsistencies

 


If you do not perform this step, the DMO run may stop with warnings in the roadmap step “Preparation”.

 

 

Benchmarking Tool

 

Before you start a complete DMO test run, we highly recommend using the benchmarking tool to evaluate the migration rate for your system, to find the optimal number of R3load processes and to optimize the table splitting.

 

Start the benchmarking mode with the following addresses:

 

http://<hostname>:1128/lmsl/migtool/<sid>/doc/sluigui

or

https://<hostname>:1129/lmsl/migtool/<sid>/doc/sluigui


This opens the following dialog box:
  Benchmarking Tool.jpg

 

Benchmark Export

 

Use this option when you want to simulate the export of data from the source system.

Proceed as follows in the dialog box:

 

1.) Select the option “Benchmark migration”

 

2.) Select the option “Benchmark export (discarding data)”
     This selection will run a benchmark of the data export and discard the data read

     from the source database (source DB).


     Note:

a) Always start with the benchmark of the export to test and optimize the performance of your source DB.

Since almost the complete content of the source DB needs to be migrated to the SAP HANA database, additional load is generated on the source DB, which differs from the usual database load of a productive SAP system.
This is an essential part for the performance of the DMO process, since on the one hand parts of the data is already transferred during the uptime while users are still active on the system. On the other hand the largest part of the data is transferred during the downtime. Therefore you have to optimize your source DB for the concurring read access during uptime to minimize the effect on active business users and also for the massive data transfers during the downtime to minimize the migration time.

 

 

b) Always start with a small amount of data for your first benchmarking run.
This will avoid extraordinary long runtimes and allow you to perform several iterations.
The idea behind this is that performance bottlenecks on the source DB can already be found with a short test run while more iterations are useful to verify the positive effects of source DB configuration changes on the migration performance.
However, too short runtimes should also be avoided, since the R3load processes and the database need some time at the beginning to produce stable transfer rates.
We recommend about 100GB or less than 10% of the source database size for the first run.
The ideal runtime of this export benchmark is about 1 hour.


Benchmarking Parameters.jpg

 

3.) Select the option „Operate on all tables“ and define the sample size as percentage of the source database size as well as the size of the largest table in the sample as percentage of the source database size.

 

4.) Also select “Enable Migration Repetition Option”.
This option enables you to simply repeat the migration benchmark without changing the set of tables. This is especially useful for finding the optimal number or R3load processes for the migration.

 

5.) Define a high number of R3load processes in your first test iteration to get enough packages from the table spitting to be able to play around with the number of parallel running R3load processes later on. For detailed information of the table splitting mechanism see the blog DMO: background on table split mechanism

Use 10 times the number of CPU cores available on the SUM host (usually the Primary Application Server) as the number of R3load processes here.
The R3loads for "UPTIME" are used for the preparation (determine tables for export), the R3loads for "DOWNTIME" are used for the export (and import, if selected), so UPTIME and DOWNTIME are no indication for uptime or downtime (concerning the configuration of R3load processes). 

Parallel Process Configuration.jpg

 

 

 

6.) Directly before starting the roadmap step “Execution”, in which the actual data migration will take place, reduce the R3load processes to 2 times the number of CPU cores available on the SUM host.

You can change the SUM process parameters during the run by means of the DMO utilities:

 

 

 

 


 

 

7.) Start the roadmap step “Execution”.
While monitoring your network traffic and CPU load, raise the number of R3load processes step by step, always waiting 10 to 15 seconds until they are started.
When either the CPU load or the network traffic reach 80% to 90%, you have found the optimal number of R3load processes for this system landscape.

 

8.) If you repeat the benchmarking run, avoid database caching.
This can either be realized by flushing the cache or by restarting the database.

 

If you want to change the table set, finish the current benchmarking run and start the test from the beginning. To avoid database caching, you can also select bigger tables that exceed the database cache.

 

 

Benchmark Export + Import

 

Use this option when you want to simulate the export of data from the source system and the import of data into the target system.

After you have executed at least one export benchmark, you can continue with benchmarking the migration export and import in combination. In this way you can find out if your target SAP HANA database is already running at peak performance or if it needs to be optimized for the mass import of migrated data.
The behavior of this combined benchmark is very similar to a real migration run since the exported data is really imported into the target HANA database. Only after a manual confirmation at the end of the migration benchmark the temporarily created database schema is dropped from the target HANA database.

Proceed as follows in the dialog box:

 

1.) Select the option “Benchmark migration”

 

2.) Select the option “Benchmark export and import”

 

 

 

 

Automatically optimize Table Splitting

 

1.) Perform a benchmark migration of the whole database to generate a durations file, which contains the migration runtimes of the most significant tables.

Configuration_complete_run.jpg

 

Set the percentage of the DB size as well as the size of the largest tables to 100% and enable the “Migration Repetition Option”.
On the process configuration screen, input the optimal number of R3load processes, identified beforehand.

 
2.) Repeat the migration phase to run the full migration benchmark again.
This time the benchmarking tool makes use of the durations file from the first full run to automatically optimize the table splitting, which should result in a shorter overall migration runtime.




 

 

 

 

Analysis

 

After a complete migration run, you can analyze the migrated data volume and the migration speed.
The SUM creates a summary at the end of the file ../SUM/abap/log/EUMIGRATERUN*.LOG:

 

Total import time: 234:30:20, maximum run time: 2:31:41.

Total export time: 222:31:49, maximum run time: 2:31:42.

Average exp/imp/total load: 82.0/87.0/168.9 of 220 processes.

Summary (export+import): time elapsed 2:41:40, total size 786155 MB, 81.05 MB/sec (291.77 GB/hour).

Date & Time: 20150803161808 

Upgrade phase “EU_CLONE_RUN” completed successfully (“20150803161808”)

 

In this example
- 220 R3load processes have been used (110 Export, 110 Import)
- the downtime migration phase took 2 hours 41 minutes
- total migration data volume was: 786155 MB (786 GB)
- migration speed was: 81 MB/s (291 GB/h)
- the migration phase ended without issues: “completed successfully”

 

In general, a good migration speed is above 300 GB per hour.

 

 

R3load Utilization

 

In the DMO Utilities, analyze the R3load utilization after a migration run.


1.) Open the DMO utilities and navigate to “DMO Migration Post Analysis -> Charts”.

 

2.) Select the file “MIGRATE_*PROC*”

 

3.) Check for a long tail at the end of the migration, in which only a small number of R3loads still process remaining tables.

 

 

For a definition of this tail and examples for a long and a short tail, see the blog

DMO: background on table split mechanism

If such a long tail is found, analyze the durations file to find out which tables cause it.

 

 

Durations file

 

1.) Open the file SUM/abap/htdoc/MIGRAT*_DUR.XML with a browser to get a graphical representation of the runtimes of the migrated tables.

 

2.) Look for long-running tables at the end of the migration phase.

 

 

In this example, the table RFBLG has a very long runtime. It is running from the beginning of the migration phase until the end.

 

 

R3load logs

 

Analyze the R3load logs to identify the origin of performance bottlenecks of long-running tables.

 

1.) Open the R3load log summary file SUM/abap/log/MIGRATE_RUN*.LOG

 

2.) Search for the problematic tables

 

3.) Analyze the R3load runtimes to identify the origin of the performance bottlenecks.


You will find R3load statistics of the time spend in total (wall time), in CPU in user mode (usr) and in the kernel system calls (sys).
There are separate statistics available for the database and memory pipe of the exporting R3load (_EXP) and the importing R3load (_IMP).

 

#!---- MASKING file “MIGRATE_00009_RFBLG_EXP.LOG”

(STAT) DATABASE times: 1162.329/4.248/0.992 93.6%/36.9%/47.6% real/usr/sys.

(STAT) PIPE    times: 79.490/7.252/1.092 6.4%/63.1%/52.4% real/usr/sys.

 

#!---- MASKING file “MIGRATE_00009_RFBLG_IMP.LOG”

(STAT) DATABASE times: 702.479/213.625/4.896 56.6%/96.6%/86.3% real/usr/sys.

(STAT) PIPE    times: 539.445/7.620/0.780 43.4%/3.4%/13.7% real/usr/sys.

 

In this example the exporting R3load spend 1162 seconds on the source DB reading data.
79 seconds were required to copy the data to the memory pipe.
The importing R3load spent 702 seconds on the target SAP HANA DB to write the data and it spend 539 seconds on the memory pipe waiting for data.

 

Conclusion: In this example the source DB was the bottleneck, because the importing R3load has been waiting for data on the pipe most of the time.
In this case you should ask the administrator of the source DB if he can do a performance analysis of this table.

 

 

 

Extended Analysis

 

If you still experience low migration speeds, an extended analysis of the following factors during a migration run might help to find bottlenecks:

 

CPU Usage

As already mentioned in the R3log analysis example, the R3loads usually wait for the database most of the time while the actual processing of the data only takes a small amount of time.
Therefore it should not happen, that the R3load processes use more than 90% of the CPU time on the application server. If this is the case, either reduce the number of R3load processes or equip the server, on which SUM is running (usually the application server), with more CPUs, if feasible.

 

 


 

Memory Usage

Analogous to the CPU usage on the server where SUM is running, enough main memory should be available for the R3load processing.
Otherwise the operating system will apply paging mechanisms that significantly slow down the migration performance.
The minimum memory usage of a single R3load process during the migration of a standard table is about 60 MB.
Especially when declustering is necessary (for target releases 7.40 and higher), the memory required by R3load is very content dependent.
Therefore it makes sense to monitor the actual memory usage during a complete test migration run to determine the optimal memory configuration.

 

 


 

Disk I/O

The performance of export and import operations on the source and target DB is depending on a good disk input/output (I/O) performance. Therefore it might be necessary to postpone activities which create heavy disk I/O (such as backup jobs) during the migration run.

Sometimes it is not obvious, which activities create disk I/O and have a negative impact on the DMO migration performance.
In this case it might be useful to actively monitor the disk I/O during a test migration to pinpoint the timeframe of problematic activities.

 

 

 

 

Network

The network can also be a bottleneck, therefore it is recommended to monitor the throughput of the different network connections (from PAS to source DB, from PAS to target SAP HANA DB) during a migration run.
Theoretically this should not be a major issue with modern LAN networks. Even an 1 Gbit LAN would already deliver an expected transfer rate of ~100 MB/s. Therefore a low throughput can be an indicator for an unfavorable setup for the migration (e.g data flow through two firewalls).
It also has to be considered, if parallel migrations of different systems or other activities that use network bandwidth, are planned.

 

 

 

 

Remove the bottlenecks

 

Depending on the results of your analysis there may be various ways to deal with the bottlenecks found.
If a more powerful machine is required for the R3load processes, it might be an option to run the SUM on a powerful Additional Application Server (AAS) instance with free resources.
In general, SUM and SUM with DMO may be executed not only on the Primary Application Server (PAS), but also on an Additioal Application Server (AAS). However, running SUM with DMO on an AAS is only supported if your system has a separate ASCS instance.

It might be even possible to use the SAP HANA Master Node for this purpose, especially if the network connection to the SAP HANA database is the bottleneck.

 

 

Housekeeping

 

Especially when performing a SAP BW migration, the positive impact of housekeeping tasks like cleaning up the persistent staging area (PSA), the deletion of aggregation tables and compression of InfoCubes should not be underestimated.

 

For details regarding the SAP BW migration using DMO see the document:
SAP First Guidance - Using the new DMO to Migrate BW on HANA

 

But even with a standard DMO you should give some thought to housekeeping before starting the migration. For example, it might be an option for you to delete or archive old data that is not accessed frequently anymore (analogous to moving BW data to Near-Line Storage) before starting the DMO migration. This data does not need to be transferred, which reduces the migration runtime, and it does not need to be stored in-memory on the target HANA database.

 

 

Table Comparison

 

After you have optimized the DMO migration using the benchmarking tool, you are ready for the first test migration run.
You have now the option to let SUM compare the contents of tables on the target database with their respective content on the source database to make sure that everything has been migrated successfully.

 

 

We recommend to switch on the table comparison for all tables in the first test run only.
The reason is that the full table comparison via checksums takes a lot of time, usually as long as the table export itself.
If no errors are found, keep the table comparison off (“Do not compare table contents”) or compare only single, business critical tables in the productive DMO migration run.
This will minimize the Downtime in the productive run.
In fact, even when "Do not compare table contents" is selected, the SUM still compares the number of rows of the migrated tables on the target database with the number of rows on the source database after the migration of their content.

 

For further information regarding the DMO table comparison see DMO: table comparison and migration tools

 

 

Downtime Optimization

 

If the performance of the standard DMO is still not sufficient after all optimization potential has been utilized (usually a migration speed of up to ~500 GB/h can be reached) and the downtime needs to be significantly shorter, additional options to minimize the downtime are available.

 

 

 

 

Downtime optimized DMO

 

The Downtime optimized DMO further reduces the downtime by enabling the migration of selected application tables during the DMO uptime.

The report RSDMODBSIZE (available with SAP Note 2153242) determines the size of the largest tables in a SAP system and gives an estimation about the transfer time required for these tables in the DMO downtime.
Tables transferred with Downtime optimized DMO in the DMO uptime effectively reduce the downtime.
The report facilitates the decision if the usage of Downtime optimized DMO is suitable and generates a list of tables as input for SLT.

 

RSDMODBSIZE.jpg

 

The following blog post describes this technology, prerequisites and how to register for pilot usage of the Downtime optimized DMO:

DMO: downtime optimization by migrating app tables during uptime (preview)

 

Note that the Downtime optimized DMO works for SAP Business Suite systems, but not for SAP BW.

 

 

 

BW Post Copy Automation including Delta Queue Cloning

 

To minimize the migration downtime of a productive SAP BW system, one of the recommended migration paths from SAP BW to SAP BW on SAP HANA comprises a system copy of your SAP BW system.
To keep things simple, SAP offers the Post-Copy Automation framework (PCA) as part of the SAP Landscape Virtualization Managementwhich includes post-copy automation templates for SAP BW as well as an automated solution for delta queue cloning and synchronization, enabling the parallel operation of your existing production system.

 

 

 

In combination with the SUM DMO the production downtime of the migration from SAP BW to SAP BW on SAP HANA can be kept at a minimum. The usage of the delta queue cloning solution requires additional steps to be performed before the standard SUM DOM is started.

 

 

 

 

For further information about the downtime-minimized migration process of SAP BW using Post-Copy Automation with delta queue cloning see the following links:

 

TechEd 2014 - Migration to BW on HANA - Best Practice

SAP First Guidance - Using the DMO Option to Migrate BW on HANA

SAP First Guidance - BW Housekeeping and BW-PCA

Three things to know when migrating SAP BW on SAP HANA

Easier Migration to SAP BW powered by SAP HANA with ABAP Post-Copy Automation for SAP Business Warehouse (SAP BW)

Post-Copy Automation

DMO = Do Math Obligations!

$
0
0

Do not complain about insufficient migration rate if you use a 1 GBit network card!

Do your Mathematic Obligations and check your network for performance prior to DMO.


Boris Rubarth

Product Management Software Logistics, SAP SE




P.S. Sorry, yes, the blog above is short and rude, but I had to draw your attention on the network side of housekeeping:

You have to check the network performance before starting with DMO: check the througput between source DB and PAS (on which SUM and R3load processes are running), and between PAS and target DB. One network tool that I am aware of is iPerf: "iPerf3 is a tool for active measurements of the maximum achievable bandwidth on IP networks."  (http://iPerf.fr). But even ftp can provide a first insight: transfer a large file, and check the throughput. Measurements like this can detect an wrong configuration of network cards, a transfer limitation due to firewalls, or other hurdles.

And network card size matters! Using a 1 Gbit network card means a maximum throughput of 439 GB / hour theoretically, practically ~ 350 GB / hour. [The math is: 1 Gbit card means 1000 MBits per second, this is 125 MByte per second, this is 429 GB per hour.]  DMO can do more, if you let it  ... see Optimizing DMO Performance So you should rather use a 10 Gbit network card.

Feel free to add your favorite network tool as comment for this blog.


Make SUM 1.0 SP 14 / 15 work for you

$
0
0

In this blog I would like to share our experience with SUM 1.0 SP 14 / 15, that are working significantly differently, and in many ways more sophisticated, than previous releases up to SP 13.

 

In fact, Boris Rubarth'scontinuousness blogs about SAP Software Logistics, and especially SL Toolset 1.0 SPS 14: improved Software Logistics Tools and SUM 1.0 SP 14 gets a buddy called SP 15 have helped us tremendously.

 

To start with, SUM 1.0 SP 14 / 15 is invoked differently from the previous releases up to SP 13. You still have to be logged on as an administrator, preferably SIDadm, but the command has changed to


.\startup confighostagent SID:

confighostagent.png

In return, you will be presented with the URLs you have to use to log into the tool, specifically:

  • SUM Java: https://hostname:1129/lmsl/sumjava/SID/index.html
  • SUM ABAP: https://hostname:1129/lmsl/sumabap/SID/doc/sluigui
  • SUM Dual stack: https://hostname:1129/lmsl/sumjava/SID/dual.html
  • SUM benchmark tool: https://hostname:1129/lmsl/migtool/SID/doc/sluigui

And respectively, if you were not on HTTPS:

  • SUM Java: https://hostname:1128/lmsl/sumjava/SID/index.html
  • SUM ABAP: https://hostname:1128/lmsl/sumabap/SID/doc/sluigui
  • SUM Dual stack: https://hostname:1128/lmsl/sumjava/SID/dual.html
  • SUM benchmark tool: https://hostname:1128/lmsl/migtool/SID/doc/sluigui

sumjava.png

Doing so, you will be presented with a nice, fresh and crisp SUM HTML5 user interface:

Process Execution.png

The new UI gives you access to the so far more hidden upgrade steps:

TASK LIST.png

As well as to the logs:

LOGS.png

Further more, it allows to set breakpoints prior to any execution step! How cool is that?!

BREAKPOINTS.png

Why SWPM does create orasid user for Oracle ASM and/or Oracle 12c?

$
0
0

Have you tried installing a system based on SAP NetWeaver on Oracle ASM and/or Oracle 12c?

Have you noticed that SWPM asks to create orasid user during the database instance installation?

Should orasid user be created?

 

I have seen some questions related to that very often. The answer for that is:

Yes, orasid still must be installed on your system.

 

I know, I know, oracle user is the responsible user for Oracle software, so why does orasid still exist?

 

The orasid user is needed for the SAP hostctrl. So, SWPM always created in an ASM and/or 12c environment both users: oracle and orasid.

 

The oracleuser is the owner of the Oracle software and also the owner of the oracle datafiles.

 

The orasid user has the correct environment (ORACLE_SID, ORACLE_HOME). Then, you do SQL*plus connection with this user.

 

You can find further details in the Installation Guide' section "Creating Operating System Users and Groups > Operating System Users and Groups > Table SAP System Users and Groups".

oracle user.png

 

You can find the Installation Guide at:

http://www.service.sap.com/sltoolset ->

Software Logistic Toolset 1.0 ->

[Scroll down the page] System Provisioning ->

Installation: Systems Based on SAP NetWeaver 7.0 / 7.0 EHPs

Installation: Systems Based on SAP NetWeaver 7.1 and Higher

SL Toolset 1.0 SPS 16: improved Software Logistics Tools

$
0
0

This blog describes the new and improved tools in the SL Toolset 1.0 with SPS 16.
    You should be familiar with the concept of the Software Logistics Toolset 1.0 ("SL Toolset"), see
      The Delivery Channel for Software Logistics Tools: "Software Logistics Toolset 1.0"

 

 

Overview on tools delivered with SL Toolset 1.0 SPS 16

 

Availability: SL Toolset 1.0 SPS 16 is available since February 15th 2016.

 

What's in:

  • compared with SPS 15, no new tool joined the SL Toolset 1.0; nZDM for SAP PI was set to "maintenance and restricted shipment mode", see SAP Note 1589311
  • information on SL Toolset are beeing migrated to help.sap.com/sltooset


sl_toolset_sps16_tool_overview.jpg

Further information on the SL Toolset SPS 16:

 

 

"nZDM for SAP NetWeaver Java" 1.0 SP 16

 

Offering

  • implement Support Packages and patches for SAP Java-stack systems with minimal technical downtime
  • Target Products:
    • SAP Enterprise Portal 7.02, 7.3x, 7.4
    • SAP Business Process Management and SAP Process Orchestration
      releases 7.3 incl. EHPs, and 7.4 (see SAP Note 2039886; logon required)

Changes with SL Toolset SPS 16

  • SAP Enterprise Portal 7.50, SAP Process Orchestration 7.50 and SAP BPM 7.50 support is now available

More information

 

 

Software Provisioning Manager 1.0 SP 10

 

Offering

With software provisioning manager, get latest SAPinst version that enables provisioning processes for several products and releases for all supported platforms – get support of latest products, versions and platforms, including latest fixes in tool and supported processes + benefit from unified process for different product versions.

 

Changes with SL Toolset SPS 16

General:

  • 7.0x/7.x: Software Provisioning Manager supports Microsoft Windows Active Directory Organizational Units (OU) on all supported Microsoft Windows versions – for more information, see SAP Note 2247673
  • 7.0x/7.x: Processes from Software Provisioning Manager 7.0x and 7.x support SAP Adaptive Server Enterprise databases with full database encryption (for example, during installation or system copy)

System installation:

  • 7.x: Option for archive-based installation of SAP Web Dispatcher and of Diagnostics in SAP Solution Manager, where downloaded archives instead of Kernel media are used
  • 7.x: For ABAP installations planned in Maintenance Planner and executed with a stack XML file, the installation procedure now automatically deploys prerequisite SAP Notes for SUM
  • 7.x: Now, also Java installations (based on SAP NetWeaver 7.31 and higher, no dual-stack systems) can be planned in Maintenance Planner and executed with a stack XML file UDI for Java
  • 7.0x/7.x: No in-system installation of Diagnostics in SAP Solution Manager anymore – instead, use the standalone option in the product catalog, if required

System copy:

  • 7.x: Option to prepare database for Database Migration Option of Software Update Manager for a combined update and database migration – option additionally provided for target databases SAP ASE
  • 7.0x/7.x: Improved heterogeneous ABAP system copy (option to perform export ordered by package size, time analyzer results or name + option to define a special package unload order) now available for all DBs
  • 7.0x/7.x: Improved Java instanceID and box number handling during Java system copy

System rename:

  • 7.x: Procedure now includes option to install a new license for distributed systems, if renamed without change of the SAP system ID

 

More information

 

 

Software Update Manager 1.0 SP 16

 

Offering

  • Consolidation of different software logistics tools into one unified software logistics tool
  • Runtime reduction: Higher degree of parallelization for certain phase types
  • Downtime reduction: Enhanced Shadow System capabilities for specific use cases
  • Combine SAP system update with migration to SAP HANA (DMO: database migration option)

 

Changes with SL Toolset SPS 16

  • Dual-stack systems: support of new SL UI user interface (SAPUI5 based)
  • Zero downtime option (ZDO) available on request

 

More information

 

 

Standalone Task Manager for Lifecycle Management Automation 1.0 SP 01


Offering

Stand-alone task manager for lifecycle management automation is a framework to execute below automated configuration templates

  • SSL configuration templates validates the SSL configuration settings both, for ABAP and for Java environments and generates HTML reports that can be used for further analysis. It also performs SSL configuration automatically and describes required manual tasks.(SAP Note 1891360)
  • SAP ERP <-> SAP CRM, template to establish connectivity between SAP ERP system and SAP CRM
  • Mobile Configuration templates for Backend, Gateway and SUP (SAP Note 1891358)
  • HANA user management and SLT (System Landscape Transformation) configuration (SAP Note 1891393)

 

Changes with SL Toolset SPS 16

  • No changes


More information

 

 

SAPSetup 9.0


Offering

SAPSetup offers easy and reliable functionality for installations of different scales:

  • Installation of frontend products without administrator permissions
  • Remote installations from Administration PC
  • Configuration and export of installation packages containing multiple products
  • Consistency check
  • Central log file analysis

 

Changes with SL Toolset SPS 16

  • SAPSetup with the latest corrections as outlined in the SAP Notes below, for example, remote installation re-designed

 

Further information:

 

 

CTS Plug-In 2.0 SP 15


Offering

  • Generic CTS to connect your non-ABAP applications with CTS
  • New user interfaces and new features for CTS
  • Central Change and Transport System (cCTS) as technical infrastructure for Change Request Management (ChaRM) and Quality Gate Management (QGM) in SAP Solution Manager 7.1 SPS 10 and higher

Changes with SL Toolset SPS 16

  • Improvements for CTS Plug-In are no longer delivered with SL Toolset, but will come with the respective SAP NetWeaver support packages, for more information see SAP Note 1665940

More information

 

AddOn Installation Tool and Support Package Manager

 

Offering

SPAM/SAINT provides easy access to lifecycle management processes by being part of the SAP NetWeaver AS ABAP stack and by being accessible directly via SAP GUI.  This way you are able to control different kinds of implementation processes, such as installing, upgrading or updating ABAP software components. SPAM/SAINT Updates themselves can be applied to ABAP-based systems independent of underlying SAP NetWeaver component versions.

 

Changes with SL Toolset SPS 16

  • No changes

 

More information

 

 

Scenario "Up-to-date Installation"

Up-To-Date Installation refers to an enhanced process for the installation of new system at any chosen stack level. The new improved process enables complete planning in Maintenance Planner, which generates a consolidated stack XML and archives, which are later consumed by Software Provisioning Manager and Software Update Manager.

More information

 

 

 

Boris Rubarth

Product Management SAP SE, Software Logistics

Optimized behavior in latest version of heterogeneous system copy with table splitting

$
0
0

If you plan to perform a heterogeneous system copy with table splitting in the next time, make sure to use the latest version of the Software Provisioning Manager, as offered by Software Logistics Toolset 1.0 SPS16 or higher (available in SAP Help Portal at help.sap.com/sltoolset).

 

With former versions, the thread dispatcher of the Migration Monitor might get blocked due to waiting for the successful processing of pre-packages (which might be very long-lasting under certain circumstances), which holds the dispatcher off starting further R3load processes. As a result, this might lead to an undesired inhomogeneous distribution of R3load processes, where in certain migration phases, only a low number of R3load processes gets active. This is visible in the graph below, showing a low number of R3laod processes in the beginning phase of the migration, taken from an example migration case:

R3load_distribution.png

 

With the latest version of Software Provisioning Manager, this behavior got optimized, so that the thread dispatcher can postpone the processing of corresponding packages to avoid waiting times in the handling of splitting packages, leading to a more harmonized distribution of a higher number of R3load processes and with this, a significant shorter runtime of the migration.

 

This optimization applies to all heterogeneous system copies (including sequential export/import and parallel export/import using FTP or file share) – only exception: behavior for parallel export/import with Socket mode is not changed, as the Socket mode requires a certain in-line processing of split table packages, so that the processing of pre-packages cannot be postponed. For all other use cases using table splitting, use the latest version of Software Provisioning Manager to automatically benefit from this optimization.

Downtime minimization when upgrading BW systems

$
0
0

This blog has the focus on updates of SAP BW and considers downtime minimization capabilities of SUM and the benefits for the SAP BW.

 

The BW upgrades are related to

  • SAP BW Updates and Upgrades,
  • DB upgrades,
  • custom development updates and releases.

 

For SAP updates you can use SPAM or the Software Update Manager (SUM)

 

The tool for upgrading SAP systems or updating bigger SP stacks is the Software Update Manager (SUM). This tool offers different mode to balance out the parameter of update run time, downtime and hardware.

 

SUM offers the following modes in general:

  • „Single System“

No use of downtime optimization in SUM. This means no parallel execution of a shadow instance, including of customer transports buffer is not supported. The single system mode for updates needs the longest duration of downtime. But the overall SUM runtime is the shortest comparing with the other modes of SUM.

  • „Standard“

A shadow instance is used to optimize the downtime because the DDIC update is therefore executed in uptime (pre-processing phase of SUM). No intensive use of hardware, the number of processes is more conservative. In standard mode the customer transport buffer can be included in general.

  • „Advanced“

The hardware is used intensively to minimize the downtime of the SUM procedure. The extended shadow instance can be used for the nZDM feature of SUM. The customer transports buffer is included as well and also table conversion of customer tables can use the extended buffer as well. The number of processes can are extended and can be maintained

 

An additional “mode” will be the zero downtime option of SUM (ZDO). It uses the shadow operation for DDIC similar to standard mode but uses an additional instance called “bridge” to manage the parallel execution of production (business) and update. However ZDO is not enabled for SAP BW yet.

 

So let’s focus of the pros and cons of the "single system", "standard" and "advanced" mode of SUM for SAP BW.

What are the benefits of the different SUM modes regarding SAP BW business downtime?

 

When considering the “advanced” mode:

  • Intensive parallelization of processes:  enabled for BW
  • nZDM feature of SUM:                        enabled for BW
  • import of customer transports:            no support of BW specific transports   

 

Regarding the downtime minimization for SAP BW updates and upgrades the shadow operation and especially the nZDM feature of SUM advanced mode is in focus.

The SUM procedure in “standard” or “advanced” mode switches the system to the maintenance mode during the upgrade procedure. This means at this time the LOCK_EU locks the Workbench and transports. Additionally the customizing is locked as well.

Latest when SUM is in the maintenance mode any BW activity that requires the change of dictionary objects in the background will be unavailable.  When the maintenance mode of SUM is set the upgrade will switch the BW automatically to “non-changeable”.

This is depending on the SUM mode you use:

  • “single system” mode: phase LOCKEU_PRE
  • “standard” or “advanced” mode: phase REPACHK2


When the entire BW system is set "non-changeable", only certain types of BW objects for which this is explicitly allowed will be changeable. (refer to SAP Note 337950).

Considering all these restrictions the shadow phase of SUM might be considered as similar to downtime by BW customers. Hence, you might ignore the downtime minimization features in SUM for your SAP BW because the restrictions are not acceptable. Also, the shadow activities extend the overall runtime of the SUM.

In summary, the most important downtime for BW customers is any time in which query execution or data loading is limited or unavailable in the BW system – something that is technically not feasible during the extended maintenance phase because of using the nZDM option.

 

Therefore, the recommended SUM mode for SAP BW might be the “single system” mode because of the relatively short overall runtime.

Viewing all 112 articles